Recently, Eneco has connected all its wind farms, solar parks, batteries, and other smaller and larger assets to the Myriad Virtual Power Plant (VPP) platform that it has developed. This is a first: at present, there are no similar VPPs of this scale in operation in the Netherlands. Towards the sustainable energy system of the future, more flexibility is needed to ensure that the electricity grid remains in balance and to become less dependent on the fossil fuels that we currently use for this purpose. Here, a VPP comes into play.